Work Packages – Deliverables

01

Research – Requirements Analysis Stage

Actions for the research and future design of the product. It includes the work package (WP):

WP 1: Definition of the Application Development Framework

A thorough study will be conducted to record and further analyze the requirements of users and businesses. The process will include interviews and questionnaires with various stakeholders.

Deliverable 1.1: Application Study

Design and Development Stage

Actions for the Design and Development of the Product with the following work packages:

WP 2: Definition of Technical Specifications – Application Design

In the second Work Package (WP2), the technical design of the project will be carried out, including the representation of system functionality through use case modeling and related diagrams. Specifically, wireframes will be used for the application design to visually support the system requirements, behavior, and functionality. At the same time, the database schema will be finalized to describe specific processes for retrieving and presenting information.

Deliverable 2.1: System Design

Deliverable 2.2: Security and GDPR Compliance Plan

WP 3: Pilot Version of the Application

Work Package (WP3) focuses on the pilot development of the web platform, which will include all the core functions and features.

Deliverable 3.1: Pilot Version of the Web Platform

WP 4: Testing and Validation

The fourth Work Package (WP4) focuses on testing and validating the pilot system. The system will be tested by a designated group of users to ensure its functionality and effectiveness according to specifications.

Deliverable 4.1: Testing and Validation Report

02

Final Release and Results Dissemination Stage

WP 5: Final Version Development

The goal of the fifth Work Package (WP5) is the development of the final, fully functional version of the application, ready for market release. All feedback and proposed improvements will be considered and appropriately incorporated. Afterward, a final test of the program will be conducted to ensure it runs smoothly and without errors in practical settings.

Deliverable 5.1: Final Version of the Web Platform
Deliverable 5.2: Detailed User Guides for Supported User Roles

WP 6: Results Dissemination

Actions will be implemented to disseminate the project results through demonstrations of the final product, highlighting its advantages and features. Dissemination activities will take place throughout the project, with particular emphasis at this stage.

Deliverable 6.1: Report on Results Dissemination Actions and Product Demonstration

03